Had a leisurely wake-up on Thursday with the intention of having a relaxed sail to Port Edgar, last stop before the Forth and Clyde canal. So I squeezed in a bit of passage planning amongst which was phoning the sea lock at the start of the canal to find out what would be a good time to arrive on Friday.
The canal is closed. Apparently a lock gate has failed, it'll be maybe three weeks before it's fixed. That was my plans thrown in the air, looks like i'm heading for the Caledonian Canal again, which is a shame, i was getting rather used to the idea of cutting through to Glasgow.
Blog Archive
-
▼
2017
(62)
-
▼
July
(19)
- Lindisfarne, Saturday 1st July 2017
- Lindisfarne, Sunday 2nd July 2017
- Lindisfarne, 3rd july
- Lindisfarne, tues, 4th July
- Lindisfarne to Eyemouth,Wednesday 5th july
- Eyemouth, Thursday 6th July 2017
- Eyemouth to Dunbar
- ¡a change of plan!
- Sunday 9th July, Dunbar 2017
- Dunbar to North Berwick, monday 10th July
- North Berwick to Leith, tue 11th July 2017
- A change of plan ¡again!
- Garton (Leith) to Aberdour, wed 12th July
- Aberdour to Anstruther, thur 13th July
- Anstruther, fri July 14th 2017
- It's been an interesting day for reading the run...
- The end
- Anstruther
- Anstruther, tue 18th July
-
▼
July
(19)
Kismet! Not to worry the Caledonian should be magnificent! Keep blogging it's great stuff from this end of the line 😎
ReplyDeleteTa for enthusiasm for the blog. The Caledonian is great, I've had boating holidays several times on it. Quite liked the idea of using a canal I had'nt seen before:-)
ReplyDelete